The demolition and reconstruction of the bridge on S.P. 76, in the area of Moie di Maiolati Spontini, involved the replacement of the existing structure with a new roadway infrastructure, aimed at improving safety and functionality of the road connection.
The intervention included an initial phase of demolition of the existing structure using mechanical equipment and dismantling operations of reinforced concrete elements. This was followed by the construction of new foundations and structural works in elevation, including piers and abutments, carried out through reinforced concrete casting.
The reconstruction included the installation of the deck using prefabricated elements handled with lifting equipment, followed by the execution of the bituminous pavement layer and the installation of lateral protection systems. The works were carried out in a fluvial and infrastructural context, requiring careful management of interferences and coordination of the complex construction phases.
Client:
Provincia di Ancona
Region:
MARCHE
Location:
Moie di Maiolati Spontini (AN)