The intervention for the renovation and expansion of the Moie district swimming pool involved building and systems works aimed at improving the overall performance of the aquatic facility and upgrading the functionality of the spaces. The works, carried out by Torelli Dottori S.p.A., affected both the building volumes and the technological systems serving the pools.
The project included the construction and completion of a building characterized by large glazed surfaces, ensuring natural daylight within the indoor areas, and by a roof with exposed timber structural elements spanning wide sections. Inside, the swimming pool is set within a covered environment featuring perimeter walkways and service areas, organized to guarantee the functionality and usability of the facility.
Client:
CIS s.r.l.
Region:
Marche
Location:
Moie di Maiolati Spontini (AN)





